07. Operators
Assign and route field workers to jobs with scheduling and status.
Prompts to get started
Build a dispatch management system. Create jobs with a title, location, priority, and required time window. Assign jobs to field workers from a team roster. Show a daily schedule view per worker and a master board of unassigned vs. assigned jobs. Include status updates (Assigned, En Route, On Site, Completed) with timestamps for each transition.